Por favor, use este identificador para citar o enlazar este ítem:
https://repositorio.pascualbravo.edu.co/handle/pascualbravo/1485
Título : | Estudio de la generación de la tercera fase por métodos electrónicos para PYMES |
Autor: | Aguiar Upegui, Andrés Julián Patiño Zapata, Juan Camilo Sepúlveda Arboleda, Gustavo Arcángel |
Director(es): | Moreno Paniagua, Carlos Mario Molina Valencia, Catalina |
Editorial : | Institución Universitaria Pascual Bravo |
Resumen: | En este primer momento, se debe realizar visitas al terreno y verificar los posibles sectores en donde se requiera aumento de capacidad en al menos una instalación. Luego, se roce de a revisar cual es el sector más factible para realizar trabajos y montajes de este tipo. El sector debe cumplir con varios requisitos, Algunos de los requisitos, básicamente se refieren a la capacidad del usuario actual comparada con la capacidad a la que se quiere llegar, ya que si esta comparación nos da un resultado significativo se considera que existe la necesidad de hacer la adecuación pertinente. También se debe tener presente, que en el transformador seleccionado el 35 % deben requerir un aumento de capacidad. Además, hay que dejar claro que no solo son los usuarios que necesiten más capacidad, sino también los que observen la necesidad de realizar mejoras en la calidad de la energía de su vivienda o local, para así poder determinar la viabilidad de implementar el proyecto de la tercera fase. Simular con un capacitor una tercera fase, es un Medio muy práctico para lograr más potencia en la red eléctrica de cualquier instalación aparte de tener un circuito eléctrico en buenas condiciones, debe tener las fases existentes balanceadas al menos en un 96%. Para este proyecto, se requieren instalaciones en donde el factor de potencia sea muy variable. |
Abstract: | Abstract: In this first moment, visits to the land must be made and the possible sectors where capacity increase in at least one facility is required must be verified. Then, rubs to review what is the most feasible sector to perform work and assemblies of this type. The sector must comply with several requirements. Some of the requirements basically refer to the capacity of the current user compared to the capacity to be reached, since if this comparison gives us a significant result it is considered that there is a need to make the appropriate adaptation. It must also be borne in mind that 35% of the selected transformer must require an increase in capacity. In addition, it must be made clear that not only are users who need more capacity, but also those who observe the need to make improvements in the quality of the energy of their home or premises. in order to determine the feasibility of implementing the project of the third phase. Simulate with a capacitor a third phase, is a very practical means to achieve more power in the electrical network of any installation apart from having an electrical circuit in good condition, must have the existing phases balanced at least 96%., For this project, facilities are required where the power factor is very variable. |
URI : | https://repositorio.pascualbravo.edu.co/handle/pascualbravo/1485 |
Aparece en las colecciones: | Tecnología Eléctrica |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
Rep_IUPB_Tec_Ele_Métodos_Electrónicos.pdf Restricted Access | Este trabajo es de acceso restringido, para acceder favor escribir a cdinfo2@pascualbravo.edu.co y enviar el link del trabajo solicitado. | 1,12 MB | Adobe PDF | Visualizar/Abrir Request a copy |
Este ítem está protegido por copyright original |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons